PIPELINES
GREAT MAN-MADE RIVER BINGAZI SECTION CATHODIC PROTECTION WORKS
Location
Bingazi-Tazerbo, Libia
Contractor
GAMA Endüstri AŞ
EPC Contractor
Marubeni, Japan
Owner
GMR Authority, Libia
Participation
Site Manager
Scope
EPC Works for overall cathodic protection works includes;
Engineering Management, Procurement of all Equipment and Systems,
Construction Management and Supervision, Commissioning Works
24.175 holes (150 mm, h-8,9 m)
274.000 meter cabling
4.500 m3 gypsum-bentonite mixture
Total 148 km pipeline